The bottleneck of the development of precast buildings
The bottleneck of the management and operation mechanism of construction enterprises.
The bottleneck of interest chain in the process of production activities.
If the enterprise makes these preparations, the cost will naturally fall.
The traditional enterprise operation and management mode is deep-rooted.
The traditional production mode has already formed an inherent interest chain, and a new interest distribution mechanism should be formed under the general contracting (EPC) management mode…
The basic reason for the early construction cost increase is that the enterprise has not fully mastered the technology, has no professional team and skilled workers, and has not established a modern enterprise management mode.
The management mode of fighting independently, substituting management by contracting and subcontracting at all levels seriously restricts the development of industrialization, and must be broken.
The bottleneck of the industry management system.
The fact that the industrialized production mode does not adapt to the current management system and mechanism is the reality of development.
The links of design, production, construction, supervision and so on will be shifted, and the scope of responsibility of the main body will be changed.
The bottleneck of the development of precast buildings is the bottleneck of the early cost increase.