China Precast Magnet

Precast Concrete Accessories

Priority should be given to replacing production capacity indicators within the area for cement construction projects! Inner Mongolia

Strictly implement policies and regulations such as capacity replacement, project filing, environmental impact assessment, and energy conservation review.

Plate Anchor

During the “14th Five Year Plan” period, the industrial structure and energy consumption structure of the entire region’s industrial field were significantly optimized, The proportion of non fossil energy consumption has significantly increased.

The summary of the relevant content related to the cement industry in the Implementation Plan is as follows: Key tasks: strictly control the production capacity scale of key carbon emission industries, strictly prohibit the construction of restricted and eliminated projects in the “Guiding Catalogue for Industrial Structure Adjustment”, open up channels for capacity transfer, explore the establishment of energy consumption indicators and carbon quota indicators with capacity transfer mechanisms, and encourage the concentrated and concentrated development of production capacity.

The efficiency of energy resource utilization in key industries has significantly improved, and new progress has been made in the promotion and application of green, low-carbon, zero carbon, and negative carbon technologies, equipment, processes, and products.

The live broadcast of the 7th Water Environment Simulation and Prediction Academic Forum on May 12th at 19:00 has ended.

Further increase the entry threshold for new renovation and expansion projects in key industries.

Recently, the Inner Mongolia Autonomous Region Department of Industry and Information Technology released the “Implementation Plan for Carbon Peak in the Industrial Field of Inner Mongolia Autonomous Region” (hereinafter referred to as the “Implementation Plan”), which proposed the overall goal.

Strictly control the access of “two high” projects, strictly implement project approval and filing, and strengthen the management of fixed assets investment energy conservation review, environmental impact assessment and early water use formalities
.

By 2030, major progress will be made in the adjustment of industrial structure and energy consumption structure in the industrial field of the whole region, the energy resource utilization efficiency of key energy use industries will reach the advanced level in China, and the green and low carbon cycle development system in the industrial field will be basically sound, so as to achieve the carbon peak goal in the industrial field on schedule.

Under the premise of meeting the dual control requirements for energy consumption in the local area, the process technology and equipment of the newly renovated and expanded high energy consuming projects must reach the domestic advanced level, and the energy utilization efficiency must meet the national advanced standards (national energy efficiency benchmark level, advanced value of energy consumption limit standard or industry advanced level, the same below).

The green manufacturing system has been basically improved, and the carbon dioxide emissions per unit of industrial added value have significantly decreased, achieving the goals and tasks set by the state and autonomous regions.

Take strong measures to implement inventory management, classified disposal, and dynamic monitoring of “two high” projects.

Related Posts