The project is constructed and developed by Chengdu high investment construction and Development Co., Ltd.
It realizes the “five sections and one environmental protection” of the construction industry, which is conducive to promoting energy conservation and emission reduction and developing green buildings, especially of great significance to improving the atmospheric environment.
Zhonghe resettlement house (Xinyi Garden Zone C) project has also been highly recognized by the quality safety station of high tech Zone in terms of environmental protection.
The three-story starting wall, slab, staircase and local beams are precast buildings with high prefabrication rate.
The targeted setting scheme of project management and control has a high assembly rate, which is not only a highlight of the project, but also a difficulty in management and control.
Therefore, the project department shall organize the general contractor to review and analyze the special construction scheme before construction, draw lessons from the construction experience of high assembly rate projects, judge the key and difficult points of construction in advance, and formulate effective solutions.
with a total investment of about 760 million yuan, covering an area of about 63 Mu and an assembly rate of more than 70%.
Recently, the supervision project of Zhonghe resettlement house (Xinyi Garden Zone C) undertaken by CSCEC consulting won the commendation of class a project in the first quarter of 2022 by Chengdu high tech Zone Park Urban Construction Bureau, ranking first among the 10 award-winning projects.
▷ stacking of cast components ▷ spraying and fog gun opening in the work of Zhonghe resettlement house (Zone C of Xinyi garden), CSCEC consulting always adheres to scientific management and efficient promotion, and realizes the comprehensive control of project safety, quality and progress with professional services and professional technology, so as to promote the high-quality development of cast buildings and promote the green construction method, Practice energy conservation and emission reduction and contribute to the protection of the ecological environment.
The project features high assembly rate, energy conservation and emission reduction.
The project department requires the general contractor to control on-site dust and noise in strict accordance with the “ten musts and ten prohibitions”, and requires the general contractor to reasonably plan the material stacking area, stack materials according to the specification requirements, set up identification signs and warning slogans, and configure fire-fighting equipment.
In terms of epidemic prevention and control, the project department urges the construction unit to implement normal epidemic management in the living area and construction site, and requires the construction unit to timely supplement and improve epidemic prevention materials, ensure that the on-site epidemic prevention materials meet the demand, and update the epidemic prevention emergency plan and the epidemic prevention and control document requirements of superior government departments in real time.
The site is narrow and difficult in dust control, noise disturbance and material stacking control.
The project is located in Zhonghe urban area, close to the occupied residential community in the west, South and North.
Take the model first, and require the general contractor to construct the model according to the scheme to solve the problems in the actual construction.
Photo: approved by the second business department: edited by the second business department: CSCEC consulting of the party construction department looks forward to your attention..
Because of its industrialized production in the component factory, cast components have the advantages of saving materials, reducing the allocation of construction personnel and reducing costs, and can effectively reduce the generation of construction waste without dust, noise and sewage pollution.